Council officers recommend approval for a new Ellesmere Port Catholic High School to replace its RAAC-hit 1960s blocks. Councillors decide on 1 December.
Plans to rebuild Ellesmere Port Catholic High School from scratch go before councillors next week, with a recommendation that they are approved.
Many of the school’s 1960s buildings are out of use because of RAAC (reinforced autoclaved aerated concrete). The Department for Education has applied to knock them down and build a new main school and sports hall on the same site in Whitby.
Cheshire West and Chester Council’s planning committee meets at 4pm on Tuesday 1 December at Ellesmere Port Library. The agenda lists the school as item 7, application 26/01344/FUL.
Overview
- What: two new buildings to replace Ellesmere Port Catholic High School, part of the Department for Education’s School Rebuilding Programme.
- Why: many existing blocks are no longer used because of RAAC, the officers’ report says.
- Recommendation: approval, with conditions.
- The big change for parents: the main entrance moves from Capenhurst Lane to Overpool Road.
- Decision: Planning Committee, Tuesday 1 December, 4pm.
What would be built
The officers’ report says the school has room for up to 1,068 pupils and 142 full-time equivalent staff on a 9.25 hectare site. Pupil and staff numbers would not change.
The plans include:
- a main school building of about 8,457 square metres, with classrooms, an assembly hall, offices and a chapel
- a separate sports hall of about 1,319 square metres, with an activity studio and changing rooms
- a multi-use games area with tennis and netball courts
- new playing fields, including football pitches, a rugby union pitch and a non-turf cricket pitch
- a car park for up to 104 cars, a drop-off loop and 200 covered cycle spaces
- a “bio-solar” green roof with solar panels, and heating from ground source heat pumps
The layout would be swapped. The new buildings go up on the current playing fields while pupils stay in the old blocks. Once everyone has moved in, the old buildings come down and new pitches are laid where they stood.
The report says the design is meant to be net zero carbon in operation. A stained-glass window in the chapel would face Overpool Road.
The new entrance on Overpool Road
The access from Capenhurst Lane would close to the high school. It would stay open only for Our Lady Star of the Sea Catholic Primary School next door, with 11 parking spaces.
Instead, cars would use a new entrance on Overpool Road. The report lists these road changes:
- a three-metre shared path for walkers and cyclists along Overpool Road, between Capenhurst Lane and Fairview Road
- a new controlled crossing on Overpool Road
- a longer 20mph zone and a relocated police lay-by
- changes at the Overpool Road, Chester Road and Woodland Road junction
The council’s highways officers raised no objection, subject to conditions. Those conditions require the junction works, the crossing and the new paths to be in place before the school opens.
What neighbours and councillors said
Residents’ objections centred on traffic. Overpool Road is already busy at drop-off and pick-up, and Whitby High School’s entrance is nearby. Others raised overlooking from classroom windows, noise and the building work itself.
Councillor Kris Fisher told planners the need to replace the school was “clear and urgent”, particularly because of RAAC. Councillor Fisher also had “serious reservations” about moving the entrance to Overpool Road on safety grounds.
Officers said the new on-site drop-off loop would take waiting cars off the road. They concluded the plan was acceptable.
Also on the agenda: 25 affordable homes in Great Sutton
The same meeting will consider 25 homes on the site of the former Sutton Beeches care home on Alvanley Road, Great Sutton. The council itself is the applicant, and officers recommend approval.
The report on Sutton Beeches says every home would be affordable. There would be:
- 12 one-bedroom flats, two of them built for wheelchair users
- five two-bedroom houses
- seven three-bedroom houses
- one four-bedroom house
The care home closed around 2019. Its building, later used as temporary supported housing, has been demolished.
What it means for you
If you drive to the school, or live on Overpool Road or Capenhurst Lane, the entrance change matters most. The officers’ report holds the full traffic assessment.
Members of the public can ask to speak. The agenda says each application can hear one objector and one supporter. Requests go to planning.committee@cheshirewestandchester.gov.uk. The meeting is also webcast live.